Showing posts with label so between one and two. Show all posts
Showing posts with label so between one and two. Show all posts

Friday, December 19, 2008

Better late then never-maybe






Once I get something scheduled, I can usually get it done. I had intended to enter things in my blog once a week. Well, It's the 19th almost two weeks later. So, I guess I really need to take the time and schedule my blog entries for a time I will remember.
Anyway, I am adding a picture of where I am at on my new piece. I restarted working on it about a week ago. I had stopped working on it so I could finish my last piece and meet a specific deadline. I am weaving this for a small monograph I am writing on small format tapestry that should be finished in June or July. I wove So Between once before at 12 epi. on a circular warp wrapped around my Hagan loom. It's a great piece, but I have never been comfortable with the end results. So after a few hours of journaling I figured out what was making me uncomfortable with the piece. It needed to be done in sewing thread at 20 epi. There were a couple of elements I wanted to change and I wanted to use a more skillful approach to the curves in the 2 metal thread swooshes and the crenellated borders. My goal is to have this piece done by the 5th of January, which means I need to hurry and put in some longer hours to meet that goal.
So Between two is being woven at half the size of my First So Between in sewing thread. It will be 14.5 inches tall and and 7.5 inches wide.be 14.5 inches tall and and 7.5 inches wide. So between-wool 12 epi